Six weeks into our medical centre refurbishment and things are going really well – we’re on schedule, the extension work is almost enclosed and most of the new consulting room partitions are in place ready for plastering.

As you can see from the images we’re using a twin wall, double-skinned partition system with cavity insulation for the consulting room walls – one of the best systems available for acoustic insulation to protect patients’ privacy.

We’re looking forward to ‘raising the roof’ on the extension this week and cracking on !